Saturday 20 January 2018
Contact US    |    Archive
aol.com
1 months ago

North Sea oil and gas pipeline repairs could take three weeks, say operators

Repairs to the Forties pipeline, which carries 40% of North Sea oil and gas, could take up to three weeks, operators have said.The pipeline has been shut to repair a crack in the pipe which was discovered last week during a routine inspection south of Aber

Read on the original site


هذه الصفحة هي مجرد قاریء تلقائي للأخبار باستخدام خدمة الـ RSS و بأن نشر هذه الأخبار هنا لاتعني تأییدها علی الإطلاق.

About last night …

- montrealgazette
Hashtags:   

North

 | 

Sea

 | 

oil

 | 

and

 | 

gas

 | 

pipeline

 | 

repairs

 | 

could

 | 

take

 | 

three

 | 

weeks

 | 

say

 | 

operators

 | 
Most Popular (6 hours)

About last night …

- montrealgazette

Most Popular (24 hours)

Most Popular (a week)

Categories - Countries
All News
Canada